Reedley · Fresno County · 93654 & More
Older 100A panels can't support solar, battery backup, EV chargers, or modern appliances. We upgrade your electrical service to 200A and replace outdated main panels throughout Fresno County and Madera County — permitted, inspected, and done right by a local licensed contractor.
Reedley Local Fact: Many Reedley homes built before 1985 have 100A panels — a common barrier to solar and EV charging that we address as part of every project.

Robbins Energy — Reedley, CA
Licensed Contractor #1063682
Electrical Panel Upgrade in Reedley
Most homes built in Fresno County and Madera County before 1990 were wired with 100A electrical service — enough for the appliances of that era. Today's energy demands are completely different. A central air conditioner, electric range, and water heater can already push a 100A panel close to its limit. Add a solar system, a home battery, and an EV charger, and you're asking a 40-year-old panel to do a job it was never designed for. A 200A service upgrade isn't just about capacity — it's about safety, code compliance, and making your home ready for the next 30 years.
Reedley has a mix of older homes and newer construction, with many properties requiring panel upgrades before solar installation. We've completed installations throughout Reedley — in zip codes 93654 — and we understand the specific permitting requirements, utility coordination, and local conditions that affect every job here.
Related Services We Offer in Reedley
Every job we do in Reedley starts with a thorough assessment. Here's what we look for and why it matters.
Most solar and battery installations require a panel assessment. If your panel is undersized or outdated, the upgrade happens before or alongside the install.
A Level 2 EV charger draws 40–50A continuously. Most 100A panels don't have the spare capacity — a panel upgrade is often required.
If you're regularly resetting tripped breakers, your panel is overloaded. This is a safety issue, not just an inconvenience.
Adding a room, converting to electric appliances, or installing a heat pump almost always requires additional panel capacity.
Every electrical panel upgrade job in Reedley is permitted where required, inspected, and completed by our licensed crew. We don't subcontract — the same team that quotes the job does the work.
Permitting in Reedley
Panel upgrades in Reedley require a permit from the City of Reedley Building Department. We handle all filings and coordinate with PG&E.
Authority: City of Reedley Building Department
We serve all of Reedley — zip codes 93654. Licensed contractor #1063682. Cash purchase only — no financing, no leases.
Recent Project
Reedley (93654) — 100A→200A panel upgrade completed ahead of a 24-panel solar installation. City of Reedley permit filed and closed. PG&E service upgrade coordinated. One-day project.
Recent Project — Reedley, CA
How It Works
01
We visit your home, assess your current panel, measure your load, and confirm what upgrade is needed. No charge, no obligation.
02
We file the electrical permit with the city building department and coordinate the utility service upgrade with PG&E. This typically takes 1–3 weeks.
03
The physical panel replacement takes 1 day. Power is off for a few hours. We handle everything from the meter to the new panel.
04
The city inspector signs off on the work. PG&E reconnects service. Your home is now ready for solar, battery, and EV charging.
Not always, but it's common in Reedley. Reedley has a significant stock of pre-1980 homes with 100A service, particularly in the older downtown and central neighborhoods. Newer north-side developments typically have 200A service. We assess your existing panel during the free site visit and tell you upfront if an upgrade is required. If it is, we bundle the panel upgrade with your solar installation — one crew, one permit process, typically completed in 2 days.
The physical panel replacement takes 1 day — power is off for 4–6 hours while we work. Permitting with the City of Reedley Building Department adds 1–2 weeks before we can schedule the work. We handle all permit filings and coordinate with PG&E for the service upgrade. Total project timeline from contract to completion is typically 3–5 weeks.
Panel upgrade costs in Reedley vary based on your current service size (60A, 100A, or 150A), meter location, whether a utility service upgrade is needed from PG&E, and conduit routing requirements. We provide a detailed, itemized written quote at no charge. Call (559) 355-1025 to schedule a free assessment.
Yes — and we strongly recommend it for Reedley homeowners. Bundling saves time (one permit process instead of two), reduces total cost, and means one crew handles everything from the meter to the roof. Most of our Reedley solar projects that require a panel upgrade are completed as a single bundled project. Ask us about bundled pricing when you get your quote.
We install Square D QO, Eaton BR, and Siemens load centers — all NEC 2020-compliant with AFCI and GFCI breakers where required. We do not install Federal Pacific or Zinsco replacements with the same brands. Every panel we install is permitted, inspected, and documented — useful for insurance and future home sale in Reedley.
Call us or submit a quote request. We'll schedule a free site assessment and give you a straight answer — no pressure, no upselling.
Licensed Contractor #1063682 · Serving Reedley & Fresno County
All Services in Reedley
Current Page
Panel Upgrade
Reedley, CA
Panel Upgrade Near Reedley