Selma, CA — 93662 · Spring 2026
Solar + Powerwall 3 + Backup Switch

30-Panel Mission Solar — Tesla Powerwall 3 + Backup Switch (Tile Roof)

Selma home on a tile roof. 30 Mission Solar 435W panels — 13.05 kW system — paired with a Tesla Powerwall 3 for overnight storage and backup capability, and a Tesla Backup Switch for consumption monitoring and seamless grid/battery transition during outages. System sized to offset the home's full annual usage. Fresno County permit filed and closed on schedule. PG&E interconnection completed without delays. Tile roof mount, solar, and Tesla storage stack installed in a single coordinated project.

Clovis, CA — 93619 · Spring 2026
Ground Mount Solar + Full Tesla Stack

81-Panel Hyundai Ground Mount — 2× Tesla Powerwall 3 + Expansion Pack + Gateway 3 + Backup Switch

Clovis property with high energy demand. 81 Hyundai 440W modules — 35.64 kW ground-mount system — the largest residential ground-mount we have installed to date. Full Tesla energy storage stack: 2 Tesla Powerwall 3 units plus 1 Tesla Powerwall 3 Expansion Pack for maximum storage capacity, 1 Tesla Gateway 3 for whole-home energy management, and 1 Tesla Backup Switch for seamless grid/battery transition during outages. System sized to offset full annual consumption with significant export under NEM. Fresno County permit filed and closed on schedule. PG&E interconnection completed. Ground-mount racking, solar, and full Tesla stack installed in a coordinated multi-day project.

Fresno, CA — 93720 · Spring 2025
Solar + Powerwall 3 + EV Charger

39-Panel JA Solar System — Tesla Powerwall 3 + Tesla EV Charger

Fresno home with high annual consumption. 39 JA Solar 440W panels — 17.16 kW system — paired with a Tesla Powerwall 3 for overnight storage and outage backup, plus a Tesla Wall Connector (Level 2 EV charger) for the homeowner's Tesla vehicle. System sized to offset full annual usage including the EV charging load. Fresno permit filed and closed on schedule. PG&E interconnection completed without delays. Single crew handled solar, battery, and EV charger in a coordinated install.

·
Solar + Panel Upgrade

North Fresno home, 2,400 sq ft, built 1978. Existing 100A Federal Pacific panel was flagged during site assessment — replaced as part of the solar project. 22 Silfab panels on south-facing composition roof, Enphase IQ8 microinverters. PG&E bill eliminated — from $390/month to the minimum connection charge. City of Fresno permit filed and closed within three weeks. Single crew handled panel replacement, solar install, and PG&E interconnection paperwork.

Clovis, CA — 93619 · Winter 2025
Tesla Powerwall Retrofit

Tesla Powerwall 3 Retrofit — Added to Existing 2019 Solar System

Northeast Clovis home with a 2019 SolarEdge system installed by a different contractor. Homeowner wanted battery backup after a 14-hour PSPS outage in fall 2024. We assessed the existing inverter, confirmed Powerwall 3 compatibility, and completed the retrofit in one day. During the next PSPS event, the home stayed fully powered — AC, refrigerator, and home office — while neighbors were dark. No solar system replacement required.

Madera, CA — 93637 · Fall 2024
Solar + Panel Upgrade

18-Panel REC System — Older West Madera Home, Permit Handled Through Madera County

West Madera home built in 1965, 1,800 sq ft. Existing 100A panel upgraded to 200A as part of the project. 18 REC Alpha panels on a hip roof with good south and west exposure. Madera County Building Department permit filed and closed in 18 business days. System sized to cover full annual usage including a window AC unit and chest freezer. PG&E interconnection completed without delays.

Sanger, CA — 93657 · Fall 2024
Solar + Enphase Battery

Solar + Enphase Battery — Sized for Evening Use Under NEM 3.0

Sanger home, 2,100 sq ft, two-story. Homeowner had received quotes from two other companies — both proposed oversized systems. We reviewed 12 months of usage data and sized a 20-panel Silfab system with a single Enphase IQ Battery 5P to eliminate the PG&E bill and cover evening loads under NEM 3.0. Fresno County permit closed in 16 business days. System went live in under five weeks from contract signing.

Kingsburg, CA — 93631 · Summer 2024
Solar + EV Charger

20-Panel Enphase System — Flat Valley Terrain, Strong South Exposure

Kingsburg home, 1,950 sq ft, built 1972. Existing 100A panel upgraded to 200A. 20 Silfab panels on a south-facing gable roof with zero shading — ideal flat valley conditions. Enphase IQ8 microinverters allow panel-level monitoring. City of Kingsburg permit processed in under two weeks. PG&E bill eliminated — summer charges that previously ran $320–$380 are now the minimum connection fee. Homeowner added a Level 2 EV charger as part of the same project.

Reedley, CA — 93654 · Summer 2024
Solar Installation

24-Panel System — High AC Load Home, July Install

Reedley home, 2,600 sq ft, four-bedroom. Summer electricity charges were running $450–$510 in July and August due to a large central AC system. We sized a 24-panel Silfab system to eliminate the full cooling load cost. Fresno County permit closed in 14 business days. Roof install completed in one day. First full summer after install: PG&E bill eliminated — only the minimum connection charge remained. System producing at 98% of projected output after first year.

Selma, CA — 93662 · Spring 2024
Solar Installation

Solar + HOA Approval — Full Permit and Interconnection Handled

Selma home in an HOA community. Homeowner was concerned about the approval process. We handled the HOA architectural review submission, City of Selma building permit, and PG&E interconnection application — the homeowner made zero calls to any agency. 18-panel REC system on a south-facing composition roof. System went live 38 days from contract signing. HOA approval came back in 11 days.

Kerman, CA — 93630 · Winter 2024
Solar + Battery Backup

16-Panel System — Rural Western Fresno County, Well Pump Household

Kerman-area rural property, 1,700 sq ft home with a well pump. Homeowner wanted solar plus battery backup to keep the well running during outages. 16-panel Silfab system paired with a Franklin WH aPower battery. Fresno County permit closed in 17 business days. Well pump, refrigerator, and essential lighting all covered by battery during a subsequent 4-hour grid outage. System sized to offset full annual usage including the pump load.

Oakhurst, CA — 93644 · Fall 2023
Dual Powerwall Retrofit

Dual Tesla Powerwall 3 — Foothill Home, Frequent PSPS Events

Oakhurst home at 2,400 ft elevation, 2,200 sq ft. Homeowner had experienced four PSPS events in the previous two years, each lasting 18–36 hours. Existing 2021 solar system was producing well but had no storage. We retrofitted two Tesla Powerwall 3 units — 27 kWh total storage — to the existing SolarEdge system. Madera County permit closed in 21 business days. During the next PSPS event, the home ran on battery for 22 hours before the grid came back.

Project Photos

Our Work Across the Central Valley

Real installations from real homes across Fresno County and Madera County.

Ready to Start Your Project?

Free site assessment. No pressure. Just straight answers from a local team.