Battery Installation · Central Valley, CA
DC-coupled battery storage designed for SolarEdge solar systems — maximum efficiency.
Licensed contractor #1063682. Serving 94 cities across Fresno, Madera, Kings, Tulare, and Merced counties. Call (559) 355-1025.
The SolarEdge Home Battery is a 9.7 kWh LFP battery that DC-couples directly to SolarEdge HD-Wave inverters. DC coupling eliminates the AC-to-DC conversion loss of AC-coupled systems, delivering higher round-trip efficiency. It integrates with the SolarEdge monitoring portal and supports backup power via the SolarEdge Home Backup Interface.
One SolarEdge Home Battery (9.7 kWh) covers critical loads for 8–12 hours. Two units are recommended for whole-home backup in larger Central Valley homes.
DC-coupled — requires a compatible SolarEdge HD-Wave inverter. Not compatible with non-SolarEdge systems without replacing the inverter.
Backup power requires the SolarEdge Home Backup Interface. Robbins Energy installs and configures the full backup system.
Compatible with 200A panels. Panel upgrade may be required for older homes.
Standard battery storage permit and PG&E interconnection required. Robbins Energy handles all permitting.
Licensed contractor #1063682. We handle the full project — design, permitting, installation, PG&E interconnection, and monitoring setup. No subcontractors. Same crew from start to finish.
Robbins Energy installs SolarEdge Home Battery across 94 cities in the Central Valley. Select your city for local installation details, utility information, and permitting specifics.
Yes. Robbins Energy installs SolarEdge Home Battery throughout Fresno, Clovis, Madera, Visalia, and all 94 cities in our service area. We are a licensed electrical contractor (#1063682) serving Fresno, Madera, Kings, Tulare, and Merced counties.
SolarEdge Home Battery installation cost depends on system size, electrical panel condition, and any required upgrades. Robbins Energy provides free, no-obligation quotes. Call (559) 355-1025 or submit a request at 559solarbattery.com/quote.
Most SolarEdge Home Battery installations take 1–2 days once permits are approved. Permit timelines vary by jurisdiction: Fresno and Clovis typically 2–3 weeks; rural county jurisdictions 3–5 weeks. Robbins Energy handles all permitting.
Yes. SolarEdge Home Battery can be retrofitted onto most existing solar systems. DC-coupled — requires a compatible SolarEdge HD-Wave inverter. Not compatible with non-SolarEdge systems without replacing the inverter.
10-year warranty Robbins Energy provides a workmanship warranty on all installations and handles warranty claims on your behalf.
Related Services & Pages