Clovis, CA · 93611 · 93612 · 93619 · Licensed #1063682
Robbins Energy installs, repairs, and maintains solar systems in Clovis. We also install home battery backup, upgrade electrical panels, and install EV chargers. Cash purchase only — no leases, no PPAs.
We serve all Clovis zip codes — 93611, 93612, and 93619. Every job is permitted, inspected, and done by our own crew.
Custom residential solar systems sized for Clovis energy use. Cash purchase — you own it outright, no lease, no PPA.
Learn MoreTesla Powerwall 3, Enphase IQ Battery 5P, Franklin WH aPower, and Sol-Ark systems installed in Clovis. Keeps your home running through PSPS outages.
Learn MoreAnnual inspections, inverter diagnostics, panel cleaning, and production monitoring for Clovis solar systems. We service all brands.
Learn More100A to 200A panel upgrades for Clovis homes adding solar, batteries, or EV chargers. Permitted and inspected.
Learn MoreSafe, NEC-compliant breaker panel replacement for Clovis homeowners. Federal Pacific and Zinsco panel replacements.
Learn MoreLevel 2 home EV charger installation in Clovis. ChargePoint, Tesla Wall Connector, Emporia. Dedicated circuit, permitted.
Learn MoreFull solar system removal for Clovis roof replacements or system upgrades. Panels removed, roof cleared, system reinstalled.
Learn MoreAdd panels to an existing Clovis solar system. Expand capacity, upgrade inverters, or add battery storage to your current setup.
Learn MoreClovis sits in the heart of the San Joaquin Valley with approximately 5.5 peak sun hours per day — one of the highest solar resources in California. Combined with PG&E's NEM 3.0 billing structure, a properly sized solar system with battery storage can significantly reduce annual electricity costs.
Clovis homeowners face summer electric bills that regularly exceed $400–$600/month during peak cooling season. A solar system sized to your annual usage, paired with a Tesla Powerwall 3 or Enphase battery, shifts your consumption to self-generated power and protects against PSPS outages.
We've installed systems throughout Clovis — from Old Town to Copper River to Harlan Ranch. Every installation is permitted through the City of Clovis Building Division and interconnected through PG&E. We handle all paperwork.
Zip Codes Served
Permit Authority
City of Clovis Building Division
Utility
Pacific Gas & Electric (PG&E) — NEM 3.0
Peak Sun Hours
~5.5 hours/day (annual average)
Neighborhoods Served
We install and service all major inverter, battery, and EV charger brands. If your system uses it, we work on it.
A large annual true-up bill doesn't automatically mean your solar system is broken — but it does mean something changed. Here's how to think through it.
Under PG&E's NEM 3.0 billing structure, Clovis solar customers receive an annual true-up statement that reconciles all the electricity you exported to the grid against all the electricity you imported. If you imported more than you exported — at the applicable rates — you owe the difference.
A true-up bill can be large for reasons that have nothing to do with equipment failure. Increased household usage (a new EV, a new HVAC system, a home addition), seasonal production gaps, or a rate plan change can all produce a higher-than-expected bill from a system that's working perfectly.
That said, a high true-up bill is also a signal worth investigating. Inverter failures, failed strings, panel soiling, and shading changes can all reduce production significantly — sometimes for months before a homeowner notices. Clovis's extreme summer heat can also accelerate panel degradation over time. If your system isn't being actively monitored, you may not know there's a problem until true-up.
If your Clovis true-up bill is significantly higher than expected, we can evaluate your system's production history, check for equipment issues, and identify whether the problem is usage-related, equipment-related, or both.
System underproduction
Panels not generating expected kWh due to shading, soiling, or degradation
Increased household usage
New EV, HVAC, pool pump, or other loads added after system was sized
Inverter failure or offline
A failed inverter stops production entirely — often unnoticed without monitoring
Failed strings or panels
One bad panel or string can reduce whole-system output significantly
NEM 3.0 export rates
Under NEM 3.0, export credits are lower — battery storage is more important than ever
Seasonal production gaps
Winter months produce 40–60% less than summer — annual billing averages this out
Rate plan changes
Moving to a different PG&E rate schedule can change your net billing significantly
No battery storage
Without a battery, daytime solar exports at low NEM 3.0 rates while you buy peak power at night
PG&E's Public Safety Power Shutoff program can cut power to Clovis for 24–72 hours during high-wind fire weather events. A Tesla Powerwall 3 paired with solar keeps your home running automatically when the grid goes down — no generator, no fuel, no noise.
Solar and electrical permits in Clovis are issued by the City of Clovis Building Division. We handle all permit filings, coordinate the utility interconnection with PG&E, and schedule the final inspection. You don't deal with the building department at all. Permit timelines in Clovis are typically 2–4 weeks.
Clovis averages 100°F+ days in summer. Solar panels produce less power as temperature rises — a well-designed system accounts for this with proper derating. The good news: Clovis has approximately 5.5 peak sun hours per day annually, which is excellent. We size systems conservatively so your annual production targets hold even in heat.
Yes. Clovis is in PG&E territory and subject to PSPS (Public Safety Power Shutoff) events during high-wind fire weather. A Tesla Powerwall 3 (13.5 kWh) keeps essential loads — refrigerator, lights, outlets, router, CPAP — running for 12–24 hours. Paired with solar, it can recharge during the day and run indefinitely through a multi-day outage.
We serve all Clovis zip codes: 93611 (central Clovis), 93612 (north Clovis / Copper River area), and 93619 (Loma Vista / Buchanan area). We also serve the Fresno-Clovis metro and surrounding communities including Sanger, Reedley, Selma, and Kerman.
No. Robbins Energy is cash-purchase only. We don't offer leases, PPAs, or financing. Cash purchase means you own the system outright, keep all incentives, and have no ongoing payments to a third party. We provide itemized written quotes so you know exactly what you're paying for.
The physical installation takes 1–2 days. Permitting with the City of Clovis Building Division adds 2–4 weeks before we can schedule the work. PG&E interconnection approval adds another 2–4 weeks after installation. Total timeline from signed contract to system turned on is typically 6–10 weeks.
Free site assessment. Written quote. No pressure. We serve all of Clovis — 93611, 93612, and 93619.