Robbins Energy serves all of Fresno County — from central Fresno and Clovis to foothill communities like Prather, Auberry, and Shaver Lake, and valley towns like Kerman, Coalinga, and Huron. New solar installs, battery backup, inverter service, panel upgrades, and EV chargers.
Licensed contractor #1063682. PG&E interconnection handled start to finish. Cash purchase only — no leases, no PPAs.
Fresno County averages 280–300 sunny days per year with peak sun hours of 5.5–6.2 per day — among the highest in California. The flat San Joaquin Valley floor provides unobstructed southern exposure for most residential rooftops, and the foothill communities east of Fresno enjoy even cleaner air and less tule fog interference in winter.
PG&E serves virtually all of Fresno County. Under Net Energy Metering, your system earns credits for excess production that offset your annual true-up bill. With Fresno County's high sun exposure and PG&E's tiered rate structure, solar payback periods are typically 6–9 years for cash purchases.
Eastern Fresno County — Sanger, Prather, Auberry, Dunlap, Shaver Lake, Tollhouse — experiences regular PSPS events during fire weather. Battery backup is especially valuable in these foothill communities. We frequently pair solar with Tesla Powerwall 3 or Enphase IQ Battery for whole-home backup.
Fresno County has multiple permitting jurisdictions. We know each one and handle all filings — you don't deal with any of it.
Residential solar permits filed with Fresno Development Department. Typical timeline: 2–3 weeks. We handle online permit submission, plan check, and coordinate the final inspection with the city inspector.
Clovis Building Division processes residential solar permits. Typical timeline: 2–3 weeks. Clovis has a streamlined online portal for solar permits. We file all documents and track status through approval.
Communities like Prather, Auberry, Dunlap, Shaver Lake, Tollhouse, Friant, and Del Rey fall under Fresno County Building Department. Typical timeline: 2–4 weeks. We handle all county permit filings and inspections.
Sanger, Reedley, Kingsburg, Selma, Kerman, Fowler, Parlier, Coalinga, Mendota, Huron, Firebaugh, and San Joaquin each have their own building departments. Timelines are often faster — 1–2 weeks. We know each jurisdiction.
All Fresno County solar systems interconnect through PG&E's NEM program. We file the interconnection application, coordinate the utility inspection, and track Permission to Operate (PTO). Most interconnections complete within 2–4 weeks after permit final.
California law (Civil Code §714) limits HOA restrictions on solar. If your community has an HOA, we prepare the required documentation package — site plan, equipment specs, and installation details — to satisfy HOA review requirements.
Click any city to see solar installation, battery, maintenance, panel upgrade, and EV charger pages for that community.
The vast majority of Fresno County is served by Pacific Gas & Electric (PG&E). Solar systems are interconnected under PG&E's Net Energy Metering (NEM) program. Your annual true-up statement reconciles production credits against consumption charges. We handle all PG&E interconnection paperwork from application through Permission to Operate (PTO).
Permit timelines vary by jurisdiction. City of Fresno and City of Clovis typically process residential solar permits in 2–3 weeks. Smaller jurisdictions like Sanger, Reedley, and Kingsburg are often faster — sometimes 1–2 weeks. Unincorporated Fresno County (Prather, Auberry, Dunlap, Shaver Lake, etc.) goes through Fresno County Building Department, typically 2–4 weeks. We handle all permit filings.
Yes. Eastern Fresno County — including Sanger, Prather, Auberry, Dunlap, Shaver Lake, Tollhouse, and foothill communities — experiences regular PSPS (Public Safety Power Shutoff) events during high-wind fire weather. Battery backup is especially valuable in these areas. Central valley cities like Fresno and Clovis experience fewer PSPS events but benefit from battery backup during grid outages and peak rate avoidance.
Fresno County averages 280–300 sunny days per year with peak sun hours of 5.5–6.2 per day — among the highest in California. A properly sized system will produce strong output from March through October. Winter production is reduced by shorter days and occasional tule fog, particularly in the valley floor. We size systems to cover your full annual PG&E usage, accounting for seasonal variation.
Yes. We service solar systems from any installer throughout Fresno County — including systems from companies that have gone out of business. Services include inverter replacement, monitoring restoration, battery retrofit, panel additions, wiring repairs, and full system takeover. We work on all major brands: Enphase, SolarEdge, SMA, Fronius, Tesla, and others.
We serve all 36 cities and communities in Fresno County — from central Fresno and Clovis to foothill communities like Prather, Auberry, Dunlap, and Shaver Lake, and valley communities like Kerman, Mendota, Coalinga, and Huron. Call (559) 355-1025 to confirm service at your specific address.
Local contractor. No national franchise. We know Fresno County permit offices, PG&E interconnection timelines, and the roof types common in your neighborhood.