CSLB License #1063682 · Fresno County & Madera County

Licensed Solar & Electrical Subcontract Installation in Fresno & Madera County

Robbins Energy provides licensed installation labor for solar companies, EPC firms, roofing contractors, general contractors, and electrical contractors across the Central Valley. Solar installs, battery backup, EV chargers, panel upgrades, inspection corrections, and overflow install support.

We operate as your installation crew — under your brand, your permit, or ours. 850+ residential installations across Fresno County and Madera County.

850+
Residential Installs
#1063682
CSLB License
70+
Cities Served
2 Counties
Fresno & Madera

Subcontract Installation Services

We provide licensed installation labor across the full residential solar and electrical scope — from new solar installs to inspection corrections on work originally done by others.

Solar Installation Subcontracting

Full residential solar installation labor — roof penetrations, racking, panel mounting, conduit runs, inverter wiring, and interconnection prep. We work under your project scope or ours.

Battery Backup Installation

Enphase IQ Battery, Franklin WH aPower, and Tesla Powerwall installation support. Gateway wiring, load management panel work, and commissioning.

EV Charger Installation

Level 2 EVSE installation for residential projects. Dedicated 240V circuit, conduit, breaker, and charger mounting. Permit-ready work for Fresno, Clovis, Madera, and surrounding jurisdictions.

Main Panel Upgrades

100A to 200A and 200A to 400A service upgrades. Required for solar interconnection, battery backup, and EV charger projects on older residential stock.

Breaker Box Replacement

Federal Pacific, Zinsco, and other recalled panel replacements. Full service replacement with permit, inspection, and PG&E coordination.

Inspection Correction Work

Failed inspection? We identify the code deficiency, correct the installation, and coordinate re-inspection. Available for projects originally installed by other contractors.

Overflow Install Support

Backlog of scheduled installs? We provide overflow labor capacity for solar, battery, and electrical projects. Contact us with your project list and timeline.

Troubleshooting & Service Work

System diagnostics, inverter fault resolution, production loss investigation, and warranty-related service calls for existing installations.

Contractor Types We Support

We work with a range of contractor types across Fresno County and Madera County. If you need licensed installation labor for a residential solar, battery, or electrical scope, contact us.

Solar Sales Companies

You close the deal — we handle the install. We work as your licensed installation crew for residential solar projects across Fresno County and Madera County. Your brand, our labor.

EPC Companies

Engineering, procurement, and construction firms managing multi-project pipelines. We provide reliable installation capacity for residential solar, battery, and electrical scopes.

Roofing Contractors

Roofing companies adding solar to their service offering. We handle the electrical and solar installation scope while you manage the roofing work — single-project coordination.

General Contractors

New construction and remodel GCs needing a licensed electrical and solar subcontractor. We handle solar, battery, panel upgrade, and EV charger scopes under your project.

Electrical Contractors

Electrical contractors with solar or battery scopes outside their core expertise. We provide installation labor and can support permit applications for solar-specific work.

Builders & Developers

Production builders and developers adding solar-ready or solar-equipped homes. We handle solar, battery, and EV charger installation for residential new construction projects.

What You Get When You Partner With Our Crew

We are not a broker. We are a licensed installation crew with 850+ residential projects across Fresno County and Madera County. When you subcontract to us, you get a crew that knows the local permit jurisdictions, the local inspection requirements, and the local conditions — including the heat loads, the older panel infrastructure, and the foothill terrain that makes Central Valley installs different from coastal California work.

Fresno County summer temperatures regularly exceed 110°F. That means AC loads are high, panel temperatures affect inverter output, and homeowners are motivated. It also means your installation crew needs to work efficiently in extreme heat — we do this every summer.

Rural Fresno County and Madera County have a high concentration of homes with 100A service, Federal Pacific panels, and aging electrical infrastructure. We have replaced hundreds of these panels as part of solar projects — it is not a complication for us, it is a standard scope item.

CSLB License #1063682
Licensed contractor — verifiable on the CSLB website.
NEC-Compliant Installations
All work meets current NEC requirements. We do not cut corners on code compliance.
Permit-Ready Work
We prepare permit-ready installation packages for Fresno County, Madera County, and incorporated city jurisdictions.
Residential Retrofit Experience
850+ residential installations across the Central Valley — including older homes with Federal Pacific panels, knob-and-tube wiring, and undersized service.
Rapid Scheduling
We maintain scheduling availability for overflow and time-sensitive projects. Contact us with your project list.
Central Valley Coverage
Fresno County and Madera County — including foothill communities, valley floor cities, and rural agricultural areas.
Inspection Correction Experience
We have corrected failed inspections from multiple jurisdictions — Fresno, Clovis, Madera, Fresno County, and Madera County.
Owner-Supplied Equipment
We install contractor-supplied or owner-supplied equipment. We verify compatibility and NEC compliance before installation.

Central Valley Subcontract Coverage

Our subcontract service area covers Fresno County and Madera County — from the valley floor cities to the Sierra Nevada foothills. We understand the permit jurisdictions, inspection requirements, and site conditions across this geography.

Fresno Valley Floor

Fresno, Clovis, Sanger, Reedley, Selma, Kerman, Fowler, Parlier, Kingsburg — high summer heat loads, strong solar irradiance, high concentration of older 100A service panels in pre-1990 housing stock. Clovis has seen significant EV adoption growth, driving demand for Level 2 EVSE installs alongside solar projects.

Fresno County Foothills

Prather, Tollhouse, Auberry, Dunlap, Squaw Valley, Shaver Lake — PG&E PSPS outage territory. Battery backup demand is high and growing. Foothill terrain requires experienced crews comfortable with steep pitches and longer conduit runs. Rural parcels often have older electrical infrastructure.

Madera County

Madera, Chowchilla, Oakhurst, Coarsegold, North Fork, Bass Lake, Ahwahnee, Raymond — Madera County permit jurisdiction for unincorporated areas. Oakhurst and foothill communities have strong battery backup demand driven by PG&E outage history. Rural agricultural areas have older panel infrastructure.

Service Area Cities

Fresno
Clovis
Madera
Sanger
Reedley
Selma
Kerman
Fowler
Parlier
Kingsburg
Oakhurst
Coarsegold
Chowchilla
North Fork
Mendota
Coalinga
Prather
Tollhouse
Auberry
Dunlap
Shaver Lake
Squaw Valley
Bass Lake
Ahwahnee
Raymond
O'Neals
Wishon
Miramonte
Big Creek
Riverdale

Contact us for projects in adjacent counties or cities not listed above.

Subcontract Project Highlights

Installation summaries from subcontract and partnership projects across Fresno County and Madera County. These are real project scopes — not testimonials.

Solar Sales Company — Overflow Install

14-Project Overflow Batch, Fresno County

A Fresno-area solar sales company had 14 residential installs scheduled over three weeks with their primary crew at capacity. We handled 8 of the 14 installs — all Silfab panels with Enphase IQ8 microinverters on composition roofs in the 93720, 93730, and 93711 ZIP codes. All 8 permits filed and closed within the project window. No callbacks.

Roofing Contractor — Solar Add-On Scope

Roof Replacement + Solar, Clovis (93611)

A Clovis roofing contractor was replacing a composition roof and the homeowner requested solar as part of the same project. The roofing company handled tear-off and re-roof; we handled the solar installation scope — 20 panels, Enphase IQ8, 200A panel upgrade, City of Clovis permit. Single project, two crews, coordinated scheduling. Permit closed in 18 business days.

Inspection Correction — Failed City of Fresno Inspection

Solar Inspection Correction, North Fresno (93720)

A homeowner contacted us after their solar installation failed a City of Fresno inspection. The original installer had left the project. We reviewed the inspection report, identified three NEC violations — improper conduit fill, missing arc-fault protection, and incorrect labeling — corrected all three, and coordinated re-inspection. Re-inspection passed on first attempt.

General Contractor — New Construction Solar

Solar-Ready New Construction, Madera County

A Madera County builder was constructing four single-family homes and wanted solar installed before occupancy. We handled solar installation, 200A panel configuration, and EV charger rough-in for all four units. Madera County permits filed as part of the building permit package. All four systems commissioned and interconnected before final occupancy inspection.

EPC Company — Battery Deployment

Battery Backup Deployment, Foothill Communities

An EPC company managing a batch of battery backup projects in Prather, Tollhouse, and Auberry engaged us for installation labor. Six Franklin WH aPower systems and two Enphase IQ Battery 5P systems installed across eight homes. Foothill terrain, varying panel configurations, and Fresno County permit jurisdiction. All eight systems commissioned and PG&E interconnection paperwork submitted.

Electrical Contractor — EV Charger Overflow

EV Charger Overflow, Clovis (93611, 93619)

A Clovis electrical contractor had a backlog of Level 2 EV charger installs from a dealership referral program. We handled 11 residential EVSE installations across two ZIP codes — dedicated 240V circuits, conduit, breakers, and charger mounting. City of Clovis permits filed and closed. All 11 installs completed within two weeks.

Contractor FAQ

Common questions from solar companies, EPC firms, roofing contractors, and general contractors.

Ready to Discuss a Subcontract Arrangement?

Contact us with your project scope, location, and timeline. We will respond with availability and a straightforward discussion of how we can support your installation pipeline.

CSLB License #1063682 · Fresno County & Madera County · 850+ Residential Installs