Hume, CA · ZIP 93628
German-engineered string inverter — the most widely serviced residential inverter in the world.
Licensed contractor #1063682. Serving Hume (93628) and all of Fresno County. Same-day response available. Call (559) 355-1025.
SMA Sunny Boy inverters are string inverters with a long track record of reliability. The Sunny Boy 5.0–7.7 series is common in Central Valley installations from 2010–2020. SMA also produces the Sunny Boy Storage for AC-coupled battery integration.
Hume is a remote mountain community in eastern Fresno County, located near Kings Canyon National Park at approximately 5,200 feet elevation. Served by ZIP code 93628, Hume has a mix of full-time residences and vacation properties surrounded by Sierra Nevada forest. The high elevation delivers two solar advantages: cooler temperatures that keep panels closer to their rated output, and strong unobstructed sun exposure from spring through fall. PSPS outages are among the most frequent and prolonged in Fresno County — PG&E regularly shuts down the transmission lines serving this area for 48–72 hours or more during fire weather. For Hume homeowners, battery backup is not optional — it is essential infrastructure.
SMA inverters are sized to match your solar array.
AC-coupled battery storage via SMA Sunny Boy Storage.
Backup requires SMA Sunny Boy Storage or compatible AC-coupled battery.
Compatible with 200A panels. Mountain communities have the highest PSPS risk and may have limited grid reliability. Battery storage is essential. Some properties are candidates for off-grid or near-off-grid configurations.
Permits issued by: Fresno County Building Department. Standard solar permit and PG&E NEM 3.0 interconnection required. PG&E NEM 3.0 interconnection required. Robbins Energy handles the full interconnection application, which typically takes 4–8 weeks for approval after permit issuance.
Mountain properties often have steep roof pitches. Robbins Energy designs systems for your specific roof geometry and sun exposure. Remote mountain community. Many homes built in the 1970s–1980s with 100-amp panels that require upgrading before solar installation. Fresno County Building and Safety Division handles permits. Service calls require advance scheduling due to remote location.
14-panel Silfab system + 2x Tesla Powerwall 3 (27 kWh) on a full-time Hume residence (93628) — dual battery for extended PSPS coverage
10-panel REC system + Sol-Ark hybrid inverter on a Hume vacation property — off-grid capable for prolonged outages near Kings Canyon
100A to 200A panel upgrade + 12-panel Enphase system + Enphase IQ Battery 5P on a 1978-built Hume home — complete electrical modernization
8-panel Silfab system + Franklin WH aPower battery on a Hume cabin — sized for essential loads including well pump during PSPS events
Yes. Robbins Energy installs SMA Sunny Boy Solar in Hume (93628) and throughout Fresno County. We are a licensed electrical contractor (#1063682). Call (559) 355-1025 or request a free quote online.
SMA Sunny Boy Solar installation cost in Hume depends on system size, your electrical panel condition, and any required upgrades. Robbins Energy provides free, no-obligation quotes. We serve all ZIP codes in Hume: 93628.
Most SMA Sunny Boy Solar installations in Hume take 1–2 days once permits are approved. Permits are processed through the Fresno County Building Department. Robbins Energy handles all permitting and PG&E interconnection paperwork.
SMA Sunny Boy Solar is a solar system. Robbins Energy assesses your existing electrical setup during the free site survey and recommends the best installation approach for your Hume home.
Under PG&E NEM 3.0, battery storage is essential to maximize the value of your solar investment. Export rates are low; storing solar for evening use avoids buying power at peak rates (4–9 PM). In Hume, summer electricity rates peak in the evening when solar production has stopped — battery storage lets you use your own solar power instead of buying from PG&E at peak rates.
This community is in a high-priority PSPS zone. PG&E regularly shuts off power here during high-wind fire weather events — sometimes for 2–5 days at a time. Battery storage with Storm Watch or equivalent pre-charge capability is strongly recommended for all households. Very high. Hume experiences 4–8 PSPS events per year, with individual outages lasting 48–72 hours or more. Remote mountain location with limited grid redundancy. Battery backup is essential.
Related Pages
SMA Sunny Boy Solar Installation — Other Cities